SIMULTANEOUS PRICING AND LOT SIZING FOR A DETERIORATING PROCESS

Hari Prasetyo(1*), Gusti Fauza(2),

(1) Dept. of Industrial Engineering, Universitas Muhammadiyah Surakarta
(2) Dept. of Industrial Engineering, IST “AKPRIND”, Yogyakarta
(*) Corresponding Author
DOI: https://doi.org/10.23917/jiti.v5i1.1588

Abstract

This paper develops Banerjee’s model (2005), on concurrent pricing and lot sizing for a supplier on the bases of contractual agreement with a buyer, by considering condition that the supplier’s production system deteriorates over time/usage. Further, it is also assumed that the bargaining position of the buyer is stronger than that of the supplier so its economic lot size policy is used to determine the supplier’s production batch size (i.e. the supplier production batch size is an integer multiple of the buyer’s order quantity). The objective of the supplier here is to determine the product’s selling price, in conjunction with an appropriate lot size policy, to maximize targeted gross profit per unit. Any relevant costs considered by the supplier are setup cost, manufacturing cost, holding cost, restoration cost, and repairing cost. To solve the model, a simple algorithm is employed, and a numerical example using Banerjee’s parameter is implemented to illustrate the works of the model.

Keywords

pricing; lot sizing; deteriorate; Banerjee’s model

References

Banerjee, A. (1986), A Supplier’s Pricing Model under a Customer’s Purchasing Policy. Omega 14, pp.409-414.

Banerjee, A. (2005), Concurrent Pricing and Lot Sizing for Make-to-order Contract Production, International Journal of Production Economics, 93-94, pp.189-195.

Kim, S.L, and Ha, D. (2003), A JIT Lot-splitting Model for Supply Chain Management: Enhancing Buyer-supplier Linkage, International Journal of Production Economics, Vol. 86, pp.1-10.

Porteus, E.L. (1986), Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction, Operations Research, Vol.34, pp.137-144.

Rossenblatt, M.J., and Lee, H.L. (1986), Economic Production Cycles with Imperfect Production Process, IIE Transaction, Vol.18, pp.48-55

Silver, E.A., Pyke, D.F. and Peterson, R. (1998), Inventory Management and Production Scheduling. New York: John Wiley & Sons,.

Article Metrics

Abstract view(s): 399 time(s)
PDF (Bahasa Indonesia): 239 time(s) PDF: 257 time(s)

Refbacks

  • There are currently no refbacks.