MODIFIKASI MEKANISME PENENTUAN PENJADWALAN JOB PADA METODE DANNENBRING
(1) Program Studi Teknik Industri, Fakultas Teknologi dan Desain, Universitas Bunda Mulia, Jln. Lodan Raya No. 2-Ancol-Jakarta Utara 14350
(*) Corresponding Author
DOI: https://doi.org/10.23917/jiti.v12i1.650
Abstract
Keywords
Full Text:
PDF (Bahasa Indonesia)References
Adam, E. E. Jr.; Ebert, R. J. 1989. Production and Operations Management. New Jersey : Prentice Hall Inc.
Al-Salem, A. 2004. “A Heuristic to Minimize Makespan in Proportional Parallel Flow Shops”. International Journal of Computing & Information Science, August 2004; pp. 98-107.
Baker, K.R. 1974. Introduction to Sequencing and Scheduling. New York: Wiley.
Bedworth, D. D. 1987. Integrated Production Control Systems, Management, Analysis, Design. New York: Wiley&Sons.
Campbell, H,G.; Dudek, R,A.; Smith, M.L. 1970. “A Heuristic Algorithm for the n job, m Machine Sequencing Problem”. Management Science, June 1970; pp. 630-637.
Dannenbring, D. 1977. “An Evaluation of Flow Shop Sequencing Heuristics”. Management Science, July 1977; pp. 1174-1182.
Garside, A.K. 2010. “Perbandingan Performansi Metode Johnson Dengan Heuristik Multi Tujuan Ditinjau Dari Makespan, Total Flow Time, Dan Iddle Time”. Jurnal Optimum; pp. 163-172.
Ginting, R. 2009. Penjadwalan Mesin. Edisi Pertama. Yogyakarta : Graha Ilmu.
Gupta, D.; Singla, P.; Bala, S.2012. “Application of Branch and Bound Technique for 3-Stage Flow Shop Scheduling Problem with Transportation Time”. Industrial Engineering Letters, Vol. 2 (1), pp. 1-5.
Hartono, Moh. 2001. “Penjadualan Produksi n job m mesin Untuk Sistem Produksi Job Shop di Perusahaan dan Industri Mesin Aneka Mesin Malang”, Jurnal Optimumm, 2001; hal. 10-18.
Heizer, J.; Render, B. 1999. Operations Management. New Jersey : Prentice Hall Inc.
Herjanto, Eddy. 1999. Manajemen Produksi dan Operasi. Jakarta : PT. Gramedia Widiasarana Indonesia.
Johnson, S.M. 1954. “Optimal two and three stage production schedule with set up times included”, Nay Res Log Quart, 1954; hal. 61-68.
Maflahah, I.; Mahcfud; Udin, F. 2012. “Model Penunjang Keputusan Jadwal Produksi Jus Buah Segar”. Jurnal Teknik Industri, Februari 2012; hal. 51-59.
Maulidya, R.; Saraswati, D.; Vania, D. 2009. “Perancangan Penjadwalan Flowshop Menggunakan Partikel Swarm Optimization Untuk Meminimasi Number of Tardy Jobs”, Jurnal Teknik Industri, hal. 189-198.
Niebel, B.; Freivalds, A. 2009. Methods, Standards, and Work Design. New York: McGraw-Hill Inc.
Palmer, D,S. 1965. “Sequencing Jobs Through a Multi Stage Process in The Minimum Total Time-A Quick Method for Obtaining A Near Optimum”, Operational Research Quarterly, 1965; hal. 101-107.
Pinedo, Michael. 2002. Scheduling : Theory, Algorithms, and Systems. New Jersey : Prentice Hall Inc. 2nd Edition.
Rizani, N. C.; Safitri, D. M.; Wulandari, P. A. 2011. “Perbandingan Pengukuran Waktu Baku Dengan Metode Stopwatch Time Study dan Metode Ready Work Factor (RWF) Pada Departemen Hand Insert PT. Sharp Indonesia, Jurnal Teknik Industri, hal. 127-136.
Tannady, H.; Steven. 2012. “Efisiensi Waktu Produksi Es Batu Sebagai Implikasi Urutan Penjadwalan Kedatangan Job yang Tepat”, Jurnal Ilmiah Teknik Industri, Juni 2012; hal. 91-101.
Untoro, W.Y. 2009. “Penerapan Metode Forward Chaining Pada Penjadwalan Mata Kuliah”, Jurnal Matematika dan Komputer Indonesia, 2009; hal. 17-24.
Wang, F.; Rao, Y. 2011. “Design and Application of a New Hybrid Heuristic Algorithm for Flow Shop Scheduling”, International Journal Computer Network and Information Security, March 2011; hal. 41-49.
Widmer, M.; Hertz, A. 1989. “A new heuristic method for the flow shop sequencing problem”, European Journal of Operation Research, 1989; hal. 186-193.
Wignjosoebroto, S. 2003. Ergonomi, Studi Gerak dan Waktu. Surabaya: Guna Widya.
Article Metrics
Abstract view(s): 1102 time(s)PDF (Bahasa Indonesia): 2900 time(s)
Refbacks
- There are currently no refbacks.