TINGKAT PERSEDIAAN SPARE PART FORKLIFT MEREK KOMATSU DENGAN PENDEKATAN MODEL PERSEDIAAN SINGLE ITEM
(1) Prodi Teknik Industri, Universitas Sebelas Maret Surakarta
(*) Corresponding Author
DOI: https://doi.org/10.23917/jiti.v4i3.1559
Abstract
Keywords
Full Text:
PDF (Bahasa Indonesia)References
Carrie, Allan, 1992, Simulation of Manufacturing System, John Willey and Sons
Dervitsiotis, K. N., 1984, Operation Management, Mc Graw Hill
Hanifah, Dewi, 2001, Penentuan Kebijakan Pengadaan Suku Cadang Mesin Produksi yang Bersifat Non Repairable untuk Peningkatan Service Level dan Minimasi Total Biaya, Tugas Akhir, Jurusan Teknik Industri, Institut Teknologi Sepuluh Nopember, Surabaya
Namit, K., dan Chen, J., 1998, Solution to The (Q,r) Inventory Model for Gamma Lead Time demand, International Journal of Physical Distribution & Logistics Management, Vol. 29 No. 2 pp. 138-151
Strijbosch, L. W. G., Heuts, dan Van Der Scoot, E. H. M., 1998, Improved Spare Parts Inventory Management : Case Study, Tilburg University, Netherlands
Tyworth, J.E. dan Ganeshan, R., 1999, A Note On Solution to The (Q,r) Inventory Model for Gamma Lead Time Demand, International Journal of Physical Distribution & Logistics Management, Vol. 30 No. 6 pp. 524-530
Tyworth, J.E., Guo Y., dan Ganeshan, R., 1996, Inventory Control Under Gamma Demand and Random Lead Time, Journal of Bussiness Logistics, Vol. 17 No. 1 pp. 291-304
Article Metrics
Abstract view(s): 414 time(s)PDF (Bahasa Indonesia): 394 time(s)
Refbacks
- There are currently no refbacks.