Abstract

Efficiency in the supply chain can be established by integrating the supplier-retailer inventory policy. This article proposes the integrated inventory model between supplier-retailer under stochastic demand. This model aims to determine the optimal review period and calculate the total inventory cost, including some defective items, backorder price discounts, and losing flexibility costs. We assume that the retailer can order  'n' times for every 'm' shipment from supplier to retailer in each production cycle under a periodic review. Stochastic conditions can cause sudden changes in orders by the retailer in large quantities, eventually forcing the supplier to reduce their setup policies. This condition makes the retailer be charged a losing flexibility cost as compensation for the reduction setup pushed by the supplier in a long-term partnership contract. Based on numerical examples and sensitivity analysis, the percentage of defective items in each shipment from supplier to retailer significantly affects integrated total inventory cost.

Keywords

integrated inventory model; losing flexibility cost; periodic review; set up policy; stochastic

Full Text:

PDF

References

Banerjee, A. (1986). a Joint Economic‐Lot‐Size Model for Purchaser and Vendor. Decision Sciences, 17(3), 292–311. https://doi.org/10.1111/j.1540-5915.1986.tb00228.x

Castellano, D., Gallo, M., Santillo, L. C., & Song, D. (2017). A periodic review policy with quality improvement, setup cost reduction, backorder price discount, and controllable lead time. Production and Manufacturing Research, 5(1), 328–350. https://doi.org/10.1080/21693277.2017.1382397

Ebrahimi, S., Hosseini-Motlagh, S. M., & Nematollahi, M. (2019). Proposing a delay in payment contract for coordinating a two-echelon periodic review supply chain with stochastic promotional effort dependent demand. International Journal of Machine Learning and Cybernetics, 10(5), 1037–1050. https://doi.org/10.1007/s13042-017-0781-6

Goyal, S. K. (1977). An integrated inventory model for a single supplier-single customer problem. International Journal of Production Research, 15(1), 107–111. https://doi.org/10.1080/00207547708943107

Goyal, S. K. (1988). “a Joint Economic‐Lot‐Size Model for Purchaser and Vendor”: a Comment. Decision Sciences, 19(1), 236–241. https://doi.org/10.1111/j.1540-5915.1988.tb00264.x

Goyal, S. K. (1995). Short Communication: A comment. European Journal of Operational Research, 82(1), 209–210.

Hojati, S., Mohammad Seyedhosseini, S., & Hosseini-Motlagh, S.-M. (2017). Coordination and profit sharing in a two-level supply chain under periodic review inventory policy with delay in payments contract. 10, 109–131.

Huang, F., & Song, H. (2020). Periodic review integrated inventory model with controllable lead time and setup cost in the presence of a service level constraint. International Journal of Services, Technology and Management, 26(6), 478–501. https://doi.org/10.1504/IJSTM.2020.110369

Jauhari, W. A. (2016). Integrated vendor-buyer model with defective items, inspection error and stochastic demand. International Journal of Mathematics in Operational Research, 8(3), 342–359. https://doi.org/10.1504/IJMOR.2016.075520

Jauhari, W. A., Mayangsari, S., Kurdhi, N. A., & Wong, K. Y. (2017). A fuzzy periodic review integrated inventory model involving stochastic demand, imperfect production process and inspection errors. Cogent Engineering, 4(1), 1–24. https://doi.org/10.1080/23311916.2017.1308653

Jauhari, W. A., & Saga, R. S. (2017). A stochastic periodic review inventory model for vendor–buyer system with setup cost reduction and service–level constraint. Production and Manufacturing Research, 5(1), 371–389. https://doi.org/10.1080/21693277.2017.1401965

Kelle, P., Al-Khateeb, F., & Miller, P. A. (2003). Partnership and negotiation support by joint optimal ordering/setup policies for JIT. International Journal of Production Economics, 81–82, 431–441. https://doi.org/10.1016/S0925-5273(02)00357-2

Kurdhi, N. A. (2016). Lead time and ordering cost reductions are interdependent in periodic review integrated inventory model with backorder price discount. Far East Journal of Mathematical Sciences, 100(6), 821–836. https://doi.org/10.17654/MS100060821

Kurdhi, N. A., & Doewes, R. I. (2019). Periodic review inventory policy with variable ordering cost, lead time, and backorder rate. Songklanakarin Journal of Science and Technology, 41(1), 1–11. https://doi.org/10.14456/sjst-psu.2019.1

Kurdhi, N. A., Jamaluddin, A., Jauhari, W. A., & Saputro, D. R. S. (2017). A periodic review integrated inventory model with controllable safety stock and setup cost under service level constraint and distribution-free demand. Journal of Physics: Conference Series, 855(1). https://doi.org/10.1088/1742-6596/855/1/012022

Lin, H. J. (2015). A stochastic periodic review inventory model with back-order discounts and ordering cost dependent on lead time for the mixtures of distributions. Top, 23(2), 386–400. https://doi.org/10.1007/s11750-014-0345-9

Lin, Y. J. (2010). A stochastic periodic review integrated inventory model involving defective items, backorder price discount, and variable lead time. 4or, 8(3), 281–297. https://doi.org/10.1007/s10288-010-0124-x

Lin, Y. J., & Lin, H. J. (2016). Optimal ordering and recovery policy in a periodic review integrated inventory model. International Journal of Systems Science: Operations and Logistics, 3(4), 200–210. https://doi.org/10.1080/23302674.2015.1080316

Linarti, U. (2014). Pengembangan Model Integrasi Produksi-Persediaan Single Vendor Single Buyer Kondisi Probabilistik Dengan Adanya Lossing FlexibilitY. Simposium Nasional Teknologi Terapan, 2007.

Mayangsari, S., Jauhari, W. A., & Kurdhi, N. A. (2017). A periodic review model for vendor-buyer system with inspection errors and adjusted production rate. 2016 2nd International Conference of Industrial, Mechanical, Electrical, and Chemical Engineering, ICIMECE 2016, 22–26. https://doi.org/10.1109/ICIMECE.2016.7910423

Nouri, M., Hosseini-Motlagh, S. M., & Nematollahi, M. (2021). Proposing a discount policy for two-level supply chain coordination with periodic review replenishment and promotional efforts decisions. In Operational Research (Vol. 21, Issue 1). Springer Berlin Heidelberg. https://doi.org/10.1007/s12351-018-0434-x

Ouyang, L. Y., Chuang, B. R., & Lin, Y. J. (2007). Effective investment to reduce lost-sales rate in a periodic review inventory model. OR Spectrum, 29(4), 681–697. https://doi.org/10.1007/s00291-007-0081-8

Article Metrics

Abstract view(s): 222 time(s)
PDF: 140 time(s)

Refbacks

  • There are currently no refbacks.