CV. Okabawes Karya Logam is a metal foundry company in Ceper, Klaten, Central Java, Indonesia that uses automatic moulding machines. This company has implemented Total Productive Maintenance which is useful for increasing the overall effectiveness of the company. The use of Flask Less Horizontal Moulding Machine in production to make product moulds is one of the breakthroughs to achieve this effectiveness. However, the usage of the Flask Less Horizontal Moulding Machine cannot be maximized due to several problems. This research was conducted on the Flask Less Horizontal Molding Machine due to the large number of defects and downtime that often occur on machines which aim to measure the value of effectiveness by collecting some supporting data. This research begins by measuring the Overall Equipment Effectiveness (OEE) value, then identifies the root of the problem with the Fishbone Diagram which has 5 main factors that influence it and continues to provide solutions to the five root causes of the problem. The results showed that the Overall Equipment Effectiveness (OEE) value on the Flask Less Horizontal Moulding Machine was 58,53%, this value is below the standard because the Japan Institute of Plan Maintenance (JIPM) set a standard of 85%. There are also 5 main root causes of the Fishbone Diagram identification that have been given solutions.

Keywords

OEE; Total Productive Maintenance; Moulding Machine

Full Text:

PDF

References

Adrian, G., & Octavia, T., (2015), Perhitungan Overall Equipment Effectiveness (OEE) di PT. ABC. Jurnal Titra, 3(2), pp. 253-256.

Agung, D., Debora, F., & Purba, H. H., (2018), Increased Productivity of Injection Molding with Analysis of Overall Equipment Effectiveness (OEE). International Journal of Research in Engineering, Science and Management, 1 (12), pp. 813-819.

Alghofari, A.K., Rifa’I, M.A. (2017). Upaya Peningkatan Produktivitas Mesin Mills Station Menggunakan Basis Overall Equipment Effectiveness (OEE). Proceedings of Simposium Nasional Teknologi Terapan (SNTT) V 2017, pp. 172-178.

Anggraini, D. A. & Saputra, A., (2018), Analisis Efektivitas Penggunaan Mesin Produksi Jendela Dan Pintu Dengan Menggunakan Metode Overall Equipment Effectiveness (Studi Kasus : PT Metta Buana Sejahtera). National Conference of IENACO, 241-248.

Atmaja, L. T., Supriyadi, E., & Utaminingsih, S., (2018), Analisis Efektivitas Mesin Pressing Ph-1400 Dengan Metode Overall Equipment Effectiveness (OEE) Di Pt. Surya Siam Keramik. Teknologi, 1 (1).

Bilianto, B.Y., Ekawati, Y. (2016). Pengukuran Efektivitas Mesin Menggunakan Overall Equipment Effectiveness Untuk Dasar Usulan Perbaikan. Jurnal Ilmiah Teknik Industri, 15(2), 116-126. DOI: https://doi.org/10.23917/jiti.v15i2.2141

Gabahne, L., Gupta, M.M., & Zanwar, D.R., (2014), Overall Equipment Effectiveness Improvement: A Case of injection molding machine. The International Journal Of Engineering And Science, 3 (8), pp. 1-10.

Hidayat, T.A., Hariyati, T.S., & Muhaeriwati, T., (2019), Analisis Fungsi Manajemen Kepala Ruangan dalam Pendelegasian kepada Ketua Tim di Unit Rawat Jalan Rumah Sakit Militer Jakarta: Fishbone Diagram. Jurnal Penelitian Kesehatan Suara Forikes, 10 (2), pp. 99-104, DOI: 10.33846/sf.v10i2.411.

Jannah, R. M., Supriyadi, & Nalhadi, A., (2017), Analisis Efektivitas Pada Mesin Centrifugal Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE), Seminar Nasional Riset Terapan, Hal. 70-25.

More, A. S., Ugale, S. K., & Unawane, D. B., (2016), Overall Equipment Effectiveness. International Journal of Advance Research in Science and Engineering, 5 (5), pp. 48-51.

Murnawan, H., & Mustofa, (2014), Perencanaan Produktivitas Kerja Dari Hasil Evaluasi Produktivitas Dengan Metode Fishbone Di Perusahaan Percetakan Kemasan PT.X, Jurnal Teknik Industri Heuristic, 11 (1), pp. 27-46.

Nakajima, S. (1998). Introduction to Total Productive Maintenace. Portland: Productivity Press Inc.

Nursanti, I., & Susanto, Y., (2014), Analisis Perhitungan Overall Equipment Effectiveness (OEE) Pada Mesin Packing Untuk Meningkatkan Nilai Availability Mesin. Jurnal Ilmiah Teknik Industri, 13 (1), pp. 96-102.

Patil, M. S., & Prasad, M. P., (2019), Improvement of Overall Equipment Effectiveness of Valve Stem Seal Finishing Machine. International Research Journal of Engineering and Technology, 6 (8), pp. 678-685.

Putri, N. A., & Gusman, M., (2017), Optimalisasi Produksi Shovel Komatsu 3000E-6 dengan Metode Overall Equipment Effectiveness (OEE) Pada Pengupasan Lapisan Overburden di Pit 2 Tambang Banko Barat PT. Bukit Asam (Persero) Tbk. Jurnal Bina Tambang, 3 (3), pp. 1300-1309.

Sunaryo & Nugroho, E. A., (2015), Kalkulasi Overall Equipment Effectiveness (OEE) Untuk Mengetahui Efektivitas Mesin Komatzu 80t (Studi Kasus Pada Pt. Yogya Presisi Tehnikatama Industri). Teknoin, 21(4), pp. 225-233, DOI: 10.20885/.v21i4.4299.

Vijayakumar, S. R., & Gajendran, S., (2014), Improvement Of Overall Equipment Effectiveness (OEE) In Injection Moulding Process Industry, IOSR Journal of Mechanical and Civil Engineering, pp. 47-60.

Article Metrics

Abstract view(s): 284 time(s)
PDF: 196 time(s)

Refbacks

  • There are currently no refbacks.