Usulan Interval Preventive Maintenance dan Estimasi Biaya Pemeliharaan Menggunakan Metode Reliability Centered Maintenance dan FMECA

Wirda Hamro Afiva(1*), Fransiskus Tatas Dwi Atmaji(2), Judi Alhilman(3),

(1) 
(2) Telkom University
(3) Telkom University
(*) Corresponding Author
DOI: https://doi.org/10.23917/jiti.v18i2.8551

Abstract

ABC is a company engaged in the production of automotive spare parts and accessories, especially motorcycles. The problems faced by the company, there is frequent damage to the CNC Milling A. The company applies preventive maintenance and corrective maintenance activities, but these maintenance activities have not yet run optimally. Therefore, a maintenance system is developed to improve machine reliability. The method used is Reliability Centered Maintenance (RCM), with the aim of determining the optimal maintenance interval and estimation of efficient maintenance costs. RCM is done by analyzing the Failure Modes Effect and Critical Analysis (FMECA). The results of the FMECA analysis are in the form of a Risk Priority Number (RPN) that shows the components of rail bearings, spindle bearings, and hoses as critical components of the system. Through the RCM method, the maintenance policy is generated in the form of 2 scheduled on-condition tasks, 2 scheduled restorations, and 3 scheduled discard tasks with maintenance time intervals in accordance with the task category and can save maintenance costs of IDR 175.602.300.

Keywords

maintenance; FMECA; RCM; maintenance task; maintenance cost

Full Text:

PDF

References

Adoghe, A.U., Awosope, C.O.A., Daramola, S.A. (2012) ‘Critical Review of Reliability Centred Maintenance (RCM) for Asset Management in Electric Power Distribution (RCM)’, International Journal of Engineering, 2 (6), 1020–1026.

Anbuselvan, S., Arunkumar, S., Guhan, G., Muruganantham, K., Rajesh, T. (2014) ‘Optimization of Productivity in Agro Industries Using Reliability Centered Maintenance’, International Journal of Technology and Engineering System, 6 (2), 203–208.

Atmaji, F.T.D. (2015) ‘Optimasi Jadwal Perawatan Pencegahan Pada Mesin Tenun Unit Satu Di PT KSM, Yogyakarta’, Jurnal Rekayasa Sistem & Industri (JRSI), 2 (2), 7–11.

Atmaji, F.T.D., Noviyanti, A. A. and Juliani, W. (2017) ‘Implementation of Maintenance Scenario for Critical Subsystem in Aircraft Engine: Case Study NTP CT7 Engine’, International Journal of Innovation in Enterprise System. doi: 10.25124/ijies.v1i01.85.

Atmaji, F.T.D., Alhilman, J. (2018) ‘A framework of wireless maintenance system monitoring: A case study of an automatic filling machine at SB company’, in 2018 6th International Conference on Information and Communication Technology, ICoICT 2018. doi: 10.1109/ICoICT.2018.8528722.

Awad, M., Afif As’ad, R. (2016) ‘Reliability centered maintenance actions prioritization using fuzzy inference systems’, Journal of Quality in Maintenance Engineering, 22(4), pp. 433–452. doi: 10.1108/JQME-07-2015-0029.

Bae, C. et al. (2009) ‘A study on reliability centered maintenance planning of a standard electric motor unit subsystem using computational techniques’, Journal of Mechanical Science and Technology, 23(4), pp. 1157–1168. doi: 10.1007/s12206-009-0305-8.

Carretero, J. et al. (2003) ‘Applying RCM in large scale systems: a case study with railway networks’, Reliability Engineering & System Safety, 82(3), pp. 257–273. doi: 10.1016/S0951-8320(03)00167-4.

Dhamayanti, D. S., Alhilman, J. and Athari, N. (2016) ‘Usulan Preventive Maintenance Pada Mesin Komori Ls440 ( Rcm Ii ) Dan Risk Based Maintenance ( Rbm ) Di Pt Abc’, Jurnal Rekayasa Sistem & Industri (JRSI), 3(April), pp. 31–37.

Gupta, G., Mishra, R.P. (2018) ‘Identification of Critical Components Using ANP for Implementation of Reliability Centered Maintenance’, Procedia CIRP, 69 (May), 905–909. doi: 10.1016/j.procir.2017.11.122.

Holgado, M., Macchi, M., Fumagalli, L. (2016) ‘Value-in-use of e-maintenance in service provision: survey analysis and future research agenda’, IFAC-Papers On Line. doi: 10.1016/j.ifacol.2016.11.024.

Alhilman, J., Atmaji, F.T.D. (2017) ‘Software Application for Maintenance System’, 2017 Fifth International Conference on Information and Communication Technology (ICoICT), 0(RCM II).

Levitt, J. (2008) ‘Lean Maintenance’, in Maintenance Management. Available at: https://www.amazon.com/Joel-Levitt-Maintenance-2008-08-15-Hardcover/dp/B00IH6YXES.

Pamungkas, I.B., Rachmat, H., Kurniawati, A. (2014) ‘Pengembangan Program Preventive Maintenance Dengan Menggunakan Metode Reliability Centered Maintenance (RCM II) dan Perhitungan Overall Equipment Effectiveness (OEE) Di Plant Ammonia Pt Pupuk Kujang 1a’, Jurnal Rekayasa dan Sistem Industri (JRSI), 1(1), pp. 99–105. Available at: http://jrsi.sie.telkomuniversity.ac.id/index.php/JRSI/article/view/115.

Praesita, I., Alhilman, J., Nopendri (2017) ‘Penilaian Kinerja Berbasis Reliability pada Continuous Casting Machine 3 (CCM 3) PT Krakatau Steel (Persero) Tbk Menggunakan Metode Reliability Availability MAintainability dan Cost of Unreliability’, Jurnal Rekayasa Sistem & Industri, 4(2), 2884–2891.

Riyanto, A., Atmaji, F.T.D., Budiasih, E. (2018) ‘Perancangan Usulan Pengelolaan Sparepart Dan Kebijakan Maintenance Pada Mesin ILA-0005 Menggunakan Metode Reliability Centered Spares (RCS) dan Reliability Centered Maintenance (RCM) Di PT. XYZ. eProceedings of Engineering, 5 (2), 2809–2815.

Ruijters, E., Guck, D., van Noort, M., Stoelinga, M. (2016) ‘Reliability-centered maintenance of the electrically insulated railway joint via fault tree analysis: A practical experience report’, Proceedings - 46th Annual IEEE/IFIP International Conference on Dependable Systems and Networks, DSN 2016, pp. 662–669. doi: 10.1109/DSN.2016.67.

Smith, D.J. (2011). Reliability, Maintainability and Risk 8e, Reliability, Maintainability and Risk 8e. doi: 10.1016/C2010-0-66333-4.

Atmaji, F.T.D., Putra, A.A.N.N.U. (2018). ‘Kebijakan Persediaan Suku Cadang Di PT ABC Menggunakan Metode RCS (Reliability Centered Spares) Spare Part Inventory Policy at ABC Company Using RCS (Reliability Centered Spare) method’, Jurnal Manajemen Industri dan Logistik, 2(1), 84–94. Available at: http://jurnal.poltekapp.ac.id/index.php/JMIL/article/view/106.

Yssaad, B., Abene, A. (2015) ‘Rational Reliability Centered Maintenance Optimization for power distribution systems’, International Journal of Electrical Power and Energy Systems, 73, 350–360. doi: 10.1016/j.ijepes.2015.05.015.

Zhou, X., Xi, L., Lee, J. (2007) ‘Reliability-centered predictive maintenance scheduling for a continuously monitored system subject to degradation’, Reliability Engineering and System Safety, 92 (4), 530–534. doi: 10.1016/j.ress.2006.01.006.

Article Metrics

Abstract view(s): 2896 time(s)
PDF: 3464 time(s)

Refbacks

  • There are currently no refbacks.