PERANCANGAN FASILITAS KERJA PADA AKTIVITAS MEMAHAT DI INDUSTRI KECIL BATU ALAM
(1) Program Studi Teknik Industri, Fakultas Teknologi Industri,Universitas Atma Jaya Yogyakarta, Jln. Babarsari No.43 Yogyakarta 55281
(2) Program Studi Teknik Industri, Fakultas Teknologi Industri,Universitas Atma Jaya Yogyakarta, Jln. Babarsari No.43 Yogyakarta 55281
(*) Corresponding Author
DOI: https://doi.org/10.23917/jiti.v13i2.634
Abstract
The techniques and the principles of work system can improve efficiency and work productivity. Work system consists of several work elements. They are man, material, environment, method, and equipment. The elements is interconnected each others. The elements was influent efficiency and work productivity. Efficiency is important in the work system. The purposes of the research is design of work facilitiess, so that can improve work productivity. Inefficiency of work motion and work facility can influent work productivity. Work posture can analyzed RULA method. The score of work postures were 5,6, and 7. The high scores have indicate that the facilities must be investigated and must be changed. The workers need to work facility to prevent musculoskeletal injury.
Keywords
Full Text:
PDF (Bahasa Indonesia)References
Dekranasda, 2005. Strategi Pengelolaan Usaha Kerajinan yang Efisien. Yogyakarta: Dekranasda DIY.
Danusastro, L. 2006. Kinerja Pasar Kerajinan dan Kinerja Ekspor Kerajinan Dunia. Yogyakarta: Dekranasda DIY.
Kurnianingtyas, M.C.D. 2011. Penilaian dan Analisis Postur Kerja pada Sistem Kerja Manual di Industri Kecil dan Menengah. Yogyakarta: UAJY.
Goetsch, D. 2002. Occupational Safety and Health. New Jersey: Prentice Hall.
Niebel, B.; Freivalds, A. 2003. Methods, Standards, and Work Design. New York, Mc Graw Hill.
Pulat, M. 1992. Fundamentals of Industrial Ergonomics. New York: Prentice Hall.
Sanders, M.; Mc Cormick, E. 1993. Human Factors in Engineering and Design. New York: Mc Graw Hill.
Sari, N. 2014. Perbaikan Postur Kerja Menurunkan Keluhan Muskuloskeletal dan Waktu Proses Pemahatan di Java Art Stone Yogyakarta. Program Studi Teknik Industri, UAJY
Sumantri. 2005. Ditunggu, Kebijakan yang Memihak UKM.Jakarta, Gramedia.
Sutalaksana, I.; Anggawisastra, R.; Tjakraatmadja, J. 2006. Teknik Perancangan Sistem Kerja. Bandung: ITB.
Article Metrics
Abstract view(s): 536 time(s)PDF (Bahasa Indonesia): 552 time(s)
Refbacks
- There are currently no refbacks.