REHABILITASI SALURAN TARUM BARAT TERKAIT TATA RUANG WILAYAH JABODETABEK
Made Sumiarsih(1*), Djoko Legono(2), Robert Kodoatie(3)(1) Universitas Gadjah Mada
(2) Universitas Gadjah Mada
(3) Universitas Diponegoro
(*) Corresponding Author
Abstract
West Tarum Canal (WTC) is a canal to convey water for irrigation to the surroundings area and for distributing raw water to Jakarta area. The total length of WTC is 69.8 miles, starting from the Curug weir to the Ciliwung River. WTC has been operated for 40 years. Recently, there has been a decline in function of this canal up to 70%. For that reason, this canal is required rehabilitation to restore it function. This paper highlights the planning and implementation of the rehabilitation work related to spatial planning of Jabodetabekpunjur.
Full Text:
PDFReferences
Balai Besar Wilayah Sungai Citarum, 2011. Presentation of Feasibility Study Report for Detailed Engineering Design and Construction Supervision for Rehabilitation of West Tarum Canal.
Balai Besar Wilayah Sungai Ciliwung - Cisadane, 2012. Pola Pengelolaan Sumber Daya Air Wilayah Sungai Ciliwung-Cisadane. Direktorat Jenderal Sumber Daya Air.
Directorate General of Water Resources, 2013. INO : Loan 2500-2501- Integrated Citarum Water Resources Management Investment Progam Periodic Financing Request (PFR) 1 (West Tarum Canal Rehabilitation), Ministry of Public Works for the Asian Development Bank.
Balai Besar Wilayah Sungai Citarum, 2013. Rencana Pelaksanaan dan Progress Pembangunan Siphon Bekasi dan Perbaikan Saluran Tarum Barat, Jakarta Water Supply Regulatory Body.
Peraturan Presiden Republik Indonesia Nomor 54 Tahun 2008 Tentang Penataan Ruang Kawasan Jakarta, Bogor, Depok, Tangerang, Bekasi, Puncak, Cianjur. Jakarta: Sekretariat Negara.
Article Metrics
Abstract view(s): 403 time(s)PDF: 959 time(s)
Refbacks
- There are currently no refbacks.